1,680 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,680 permits
Installation of pipe scaffold as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Filing for new plumbing and sprinkler work associated w/tenant fit out, as per plans submitted herewith. No change to use, egress or occupancy.
Erect illuminated non advertising Halo/Back sign on wall. No change of use, egress or occupancy
Dev.Hub Consultation 10/25/23. Application filed to erect 17 story new building.
Application filed for sprinkler additions/modifications on the 7th floor as per plans filed herewith. no change in use, egress, or occupancy.
Sp work as per plans in conjunction with alt2 application
Structural work filed in conjunction with the eating & drinking establishment renovation as per plan. No change in use, egress, or occupancy under this application
Alt. GC filed for interior renovation demo and to erect new non-load-bearing partition, doors, flooring, millwork and finishes. No change in use, egress and occupancy.
Sprinkler work on the 17th floor (corridor/lobby/boardroom) as indicated on drawings.
Modifications to existing plumbing and sprinkler systems in 7th floor commercial office space. no change to use, occupancy or egress
Modification of Sprinkler System as shown on plans
This alt gc application is being filed for the tenant fit-out of an existing retail space in a high rise office building. work includes new shuttle lula elevator and convenience st…
Installation of a temporarily Plywood Enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appli…
Hereby filing to install plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Plumbing work on the 10th floor (Ramboll) as indicated on drawings.
General construction including renovation of an existing accessory pantry located on accessory terrace. No change in use, egress, or occupancy.
Minor interior partition changes as per plans. no change to use, egress or occupancy filed under this application.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Construction of new access stair, louvered screen and railing on elevated steel platform on upper and lower levels.new grating on lower level of tank platform and new grating on up…