3,497 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,497 permits
Modification to existing Sprinkler & plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application.
Install new 4 wc, 4 lavs, 2 floor drains, 2 sinks, 1 dishwasher, 1 hwh non gas, 1 water piping & 1 sanitary piping.
Interior renovation of apt 11k on the 11th floor. scope of works as shown in plans. no change in egress, occupancy or use.
Filing herewith interior demo. and renovation to the 25th FL. as per plans filed. No change to use, egress, or occupancy.
Interior removals work at 50m/49c floor including partition, ceiling and door removals as per plans. no change in use, egress or occupancy.
Infill existing stair and provide new framing and concrete slab on metal deck on partial 22nd floor as per plans. No change to use, egress or occupancy.
Propose interior renovations as per drawings filed herewith. No change in use, egress or occupancy.
Interior renovation to apt 2401 only - remove non-load bearing partitions and install new partitions for new bathroom. new plumbing work, finishes and lighting. no change to egress…
Plumbing work to apartment 8d as per plans filed herewith. no change to use, egress or occupancy.
Install (13) WCs, (9) Lavatories, (4) urinals, (2) DWs, (6) sinks, (1) CM, (2) IM, (8) Floor drains, (4) HWH and associated CW/sanitary piping on the 21st Floor as per plans (RGHQ…
Installation and use of temporary overhead protection & supported scaffold as per plans filed herewith. no change in use, egress, or occupancy.
facade repairs as per plans filed herewith. no change to use, egress or occupancy.
Install new 4 wc, 4 lavs, 1 kitchen sinks, 1 mop sink, 2 floor drains, 1 dishwasher, 1 hwh non gas, 1 domestic water piping & 1 sanitary piping.
Installation of temporary interior scaffold system stair tower for worker access during construction operations of Alt CO filed under DOB NOW M00940950-I1 and Demolition M009564110…
Plumbing work for Steptoe on marketing floors 43,44 & 45 (construction floors 42,43 & 44)
Interior renovations as per plans filed herewith. No change to use, egress or occupancy.
Filing herewith Mechanical work as per per plans filed herewith. No change to use, egress or occupancy.
Plumbing work as shown on plans filed herewith. No change to use, egress or occupancy.
Application filed for general construction, repairs and improvements to the Kirkland Chapel and adjacent accessory spaces.
Removal of existing sprinkler heads and piping and installation of temporary core sprinkler protection (TCSP) as per plans filed herewith. No change in use, egress or occupancy und…