3,497 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,497 permits
Interior renovations as per plans filed herewith. No change to use, egress or occupancy.
Propose interior renovations as per drawings filed herewith. No change in use, egress or occupancy.
Interior removals work at 50m/49c floor including partition, ceiling and door removals as per plans. no change in use, egress or occupancy.
Suspended scaffold outrigger system for exterior facade painting works and inspection at 273 west 38th street, manhattan, ny 10018
Installation and use of temporary overhead protection & supported scaffold as per plans filed herewith. no change in use, egress, or occupancy.
Interior alterations to the 4th floor office space to include general construction work as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress
Sprinkler system installation associated with new building construction filed under NB 121209192. Standpipe filed under M00452883-I1
Removal and disposal of interior partitions, doors, suspended ceilings, stair and finishes on the 31st floor (Electra Usa) as per plans. No change to use, egress or occupancy.
Installation of a temporary construction fence as per pans during nb construction. no change in use, egress or occupancy. fence to comply with 2014 nyc building code, chapter 33.
Standpipe system installation associated with new building construction filed under NB application number 121209192. Sprinkler is filed under M00452873-I1.
Sprinkler head changes as indicated on plans.
mechanical equipment to assist with demolition and chute will be built to lower debris
Modifications to the existing plumbing system on the 31st - 33rd Floors as per plans. No change to use, egress or occupancy.
Removal of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.
Installation of two (2) new boilers with natural gas burners. no change to use, egress, or occupancy.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Installation of temporary suspended scaffolds and material hoist on monorail, per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and…
Structural work as shown on plans. No change to use, egress, or occupancy.
Furnish & installation of new plumbing fixtures & equipment's in Core Restrooms, New Pantry Area & Wellness Room. No change in use, egress or occupancy under this application.
Perform mechanical work for an existing 42-story office building, design includes the installation of vrf heating and cooling systems and building exhaust and fresh air system. no…