3,497 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,497 permits
Install plumbing fixtures and related piping. new: 6 wc, 6 lavs, 6 sinks, 5 dishwashers, 3 floor drains, 7 hwh non gas, 1 shutoff valve, 1 water piping & 1 sanitary piping.
Plumbing modifications (melius) as indicated on plans. no change in use, egress or occupancy.
Interior Demo of existing Mechanical Ductwork and related equipment on thr 2nd floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
Sprinkler work on associated piping as shown on plans filed herewtih
Interior Demo to existing 2nd floor office space as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
General construction on 20th floor (and associated stair work between 19 and 20) as per plans filed herewith. No change to use, egress or occupancy.
Plumbing work on associated piping as shown on plans filed herewith
Interior non-structural renovation on partial 21st floor including demolition and construction of non-load-bearing partitions, new doors and frames, and interior finishes per appro…
Engineered Enclosure System for Full Building Demolition
Installation of suspended scaffold for facade inspection/repair.
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per emergency letter. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building c…
Installation and use of temporary contractor shed/shanty as per plans filed herewith.
Proposed alterations to an existing condominium in an existing building- the olympic tower. apt # 36d. replacement of existing plumbing fixtures, replacement ofkitchen appliances.
Structural framing and modifications on floors 19-21 as per plans filed herewith. No changes to use, egress or occupancy.
Hereby filing for an alteration type 1 to change to the proposed use, egress and occupancy for an existing 4 story buillidng. .
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
Sprinkler system installation associated with new building construction filed under NB 121209192. Standpipe filed under M00452883-I1