3,497 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,497 permits
Plumbing modifications (melius) as indicated on plans. no change in use, egress or occupancy.
Install plumbing fixtures and related piping. new: 6 wc, 6 lavs, 6 sinks, 5 dishwashers, 3 floor drains, 7 hwh non gas, 1 shutoff valve, 1 water piping & 1 sanitary piping.
Perform mechanical work for an existing 42-story office building, design includes the installation of vrf heating and cooling systems and building exhaust and fresh air system. no…
Installation of suspended scaffold for facade inspection/repair.
Structural work as shown on plans. No change to use, egress, or occupancy.
Engineered Enclosure System for Full Building Demolition
Sprinkler head changes as indicated on plans.
Interior alterations to the 4th floor office space to include general construction work as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress
Standpipe system installation associated with new building construction filed under NB application number 121209192. Sprinkler is filed under M00452873-I1.
Installation of a temporary construction fence as per pans during nb construction. no change in use, egress or occupancy. fence to comply with 2014 nyc building code, chapter 33.
Installation of temporary heavy duty sidewalk shed as per emergency letter. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building c…
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Installation and use of temporary contractor shed/shanty as per plans filed herewith.
Installation of temporary suspended scaffolds and material hoist on monorail, per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and…
mechanical equipment to assist with demolition and chute will be built to lower debris
Structural framing and modifications on floors 19-21 as per plans filed herewith. No changes to use, egress or occupancy.
Interior non-structural renovation on partial 21st floor including demolition and construction of non-load-bearing partitions, new doors and frames, and interior finishes per appro…
Interior Demo of existing Mechanical Ductwork and related equipment on thr 2nd floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
Removal of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.