3,497 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,497 permits
General construction on 20th floor (and associated stair work between 19 and 20) as per plans filed herewith. No change to use, egress or occupancy.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Interior Demo to existing 2nd floor office space as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress
Sprinkler work on associated piping as shown on plans filed herewtih
Interior Demo of existing Mechanical Ductwork and related equipment on thr 2nd floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
Interior non-structural renovation on partial 21st floor including demolition and construction of non-load-bearing partitions, new doors and frames, and interior finishes per appro…
Installation of two (2) new boilers with natural gas burners. no change to use, egress, or occupancy.
Plumbing modifications taking place on the 9th floor as indicated on the drawings.
Interior fit out of a portion of a multi tenant floor as shown on drawings. No change in use, egress or occupancy.
Mechanical modifications as per plans filed herewith. No change to use egress or occupancy.
Equipment use: dual 7000 # capacity personnel hoist during bldg alteration, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under th…
Modifications to the existing standpipe on the 32nd Floor, as per plans. No change to use, egress, or occupancy.
Installation of temporary working platofrm as per plans. platofrm shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Sprinkler modifications as per plans filed herewith. No change to use, egress or occupancy.
Mechanical work at 31st floor as shown on plans filed herewith. no change in use, egress or occupancy under this application
Interior renovations and modifications as per plans filed herewith. No change to use, egress or occupancy
New office renovation includes new offices, open workstations, conference rooms, pantry and core restrooms. No change in use, egress, occupancy
Install 189 new sprinkler heads and pipng.
Modifications to the existing sprinkler system on the 30th Floor as per plans. No change to use, egress, or occupancy.