3,497 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,497 permits
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Mechanical scope associated with the renovation of the one-tenant office space on 34M/33C floor. No change of use, egress, or occupancy.
Architectural scope associated with the renovation of the one-tenant office space on 34M/33C floor. No change of use, egress, or occupancy.
Filing herewith support of excavation for elevator pit in conjunction with dob#: m01304500-i1 . no change to use, occupancy or egress
Modification to existing sprinkler system and related piping as shown on drawings. no change to use, egress or occupanyc.
Removal of plumbing fixtures on the 3rd floor, 23rd floor construction (24th floor marketing), 24th floor construction (25th floor marketing) as indicated on drawings.
Modifications to existing HVAC and ductwork as per plans filed herewith. No change to use, egress, or occupancy.
Modifications to the existing sprinkler system on the 31st - 33rd Floors as per plans. No change to use, egress, or occupancy.
Furnish & installation of new plumbing fixtures & equipment's in Core Restrooms, New Pantry Area & Wellness Room. No change in use, egress or occupancy under this application.
Installation of temporary working platofrm as per plans. platofrm shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Equipment use: dual 7000 # capacity personnel hoist during bldg alteration, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under th…
Mechanical work at 31st floor as shown on plans filed herewith. no change in use, egress or occupancy under this application
Interior renovations and modifications as per plans filed herewith. No change to use, egress or occupancy
Interior fit out of a portion of a multi tenant floor as shown on drawings. No change in use, egress or occupancy.
Install 189 new sprinkler heads and pipng.
Modifications to the existing sprinkler system on 20th floor as per plans filed herewith. No changes in use, egress or occupancy.
Plumbing modifications taking place on the 9th floor as indicated on the drawings.
Mechanical modifications as per plans filed herewith. No change to use egress or occupancy.