3,509 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,509 permits
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Modifications to the existing sprinkler system as per plans. No change to use, egress or occupancy.
Plumbing work in association with mechanical filing m01348791. no change to egress, use, or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Temporary roof protection as per drawings. roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Modifications to the existing HVAC system on the 14th & 15th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.
Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Heavy duty sidewalk shed during exterior work. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of sidewalk shed to protect pedestrian from the facade repairs on the street facing facade.
Interior renovation of apt #20C. New finishes & millwork, replacement of kitchen & bathroom fixtures & appliances (filed under separate DOB application). Replace windows in existin…
Interior alterations to apt 8fg. no changes in occupancy use or egress proopsed undere this application.
9th fl: interior removals as per plans filed herewith. no change to use, egress or occupancy
Herewith filing for the installation of plumbing fixtures, as per plans submitted. No change to use, egress or occupancy.
Soe work in conjunction with elevator shafts and concrete foundations in the cellar and sub cellar of an existing structure
Filing to patch, repair, and replace facade surfaces as per plans. No change in use, egress, or occupancy under this application.
Install and register one ac for the 1st floor restaurant. no change in use, egress or occupancy.
Plumbing work on the 17th floor (Mamiye) as indicated on drawings.
Sprinkler modifications as per plans filed herewith. no change to use, bulk, egress, or occupancy is proposed.
Alterations to mechanical system on 1st and 2nd floor as plans. No change to use, egress or occupancy.
Propose new ductwork. No change to use, egress or occupancy.