3,509 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,509 permits
Sprinkler modifications as per plans filed herewith. no change to use, bulk, egress, or occupancy is proposed.
Propose new ductwork. No change to use, egress or occupancy.
Sprinkler modifications taking place on the 18th floor (19th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Mechanical work on partial 22nd floor as per plans. No change to use, egress or occupancy.
Floor 1 : interior renovation of existing lobby. cellar: interior renovation of fitness, corridor & bathrooms. change in use. no egress or occupancy change.
Construction of New Commercial High Rise Building. NYC Development HUB Consultation on 8.11.2021. ENERGY MODELING SUBMITTED UNDER MECHANICAL SUBSEQUENT FILING M00615380-S5.
Replace fixtures as noted in apt 12-B, 14-AB,15-I,15-A
Modification of existing sprinkler system. no change to use, egress or occupancy.
Install 1 wc, 1 lav, 6 sinks, 3 dishwashers, 3 water filters, 4 hwh non gas, 5 floor drains, 1 water piping & 1 sanitary piping.
sprinkler modifications on 11th floor as per plans filed herewith. no changes in use, egress or occupancy.
Interior renovation of existing 1st floor docotr's office as per final co #101045833f including the removal & installation of non-load bearing partitions, new floor & wall finishes…
Temporary plywood storefront enclosure
General construction associated with replacement of existing heating plant. no change in egress or occupancy.
Plumbing work as shown on plans filed herewith.
Renovate exist lobby & install new marquee/portico by OSP lobby entrance area within property line. New furring walls, flooring, ceiling. replace exist exterior stucco wall area by…
Application filed for sprinkler additions/modifications on the partial 14th floor as per plans filed herewith. no change in use, egress, or occupancy.
Facade repairs as per plans filed herewith. No change in use, egress or occupancy.
General construction as shown on plans filed herewith. No change in use, egress, or occupancy.
Alterations to mechanical system on 1st and 2nd floor as plans. No change to use, egress or occupancy.
Standpipe modifications for 9th floor commercial space as per plans filed herewith.