3,497 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,497 permits
Propose to perform interior renovations. No change in use, egress or occupancy.
Mechanical modifications taking place on the 18th (19th floor marketing) floor as per drawings filed herewith. no change in use, egress or occupancy.
Mechanical modifications as per plans filed herewith. No change in use, egress or occupancy.
Modification and installation of plumbing fixtures, and replacement of gas range with gas cooktop.
facade inspections
Interior removals work on the 55m/54c - 56m/55c floors to include partition, ceiling, and door removals as per plans. no change of use, egress or occupancy.
Subsequent is filed only for compliance with energy conservation for lighting
Plumbing modifications taking place on the 18th floor (19th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans,
As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy un…
General renovations consisting of demolition and construction at Rooftop Bar, Lounge, Kitchen, Back of house spaces and Marquee at existing Hotel
Install AC split system & associated ducting and diffusers for renovation of residential lobby at 1st floor. Work is in conjunction with M01006382.
Facade repairs as per plans. No change to use, egress or occupancy.
Mechanical modifications taking place on the 12th floor as per drawings filed herewith. no change in use, egress or occupancy.
Removal plumbing/sprinkler components throughout building as per plans. There is no change in use, egress or occupancy as part of this application.
Interior renovation of the hotel dweling units ( rooms) for accessibility compliance. no change in use egress or occupancy.
Architectural modifications taking place on 37C/38M and 38C/39M as per plans filed herewith. No change in use, egress or occupancy.
General construction modifications as per plans filed herewith. No change in use, egress or occupancy.
Installation of heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. all work to comply with chapter 33 of nycc
Interior work on floor 2-15; including the upgrading of interior furnishings and finish of hotel guestrooms and corridors. no change in use, egress or occupancy.