3,497 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,497 permits
General construction modifications as per plans filed herewith. No change in use, egress or occupancy.
Modifications to the existing plumbing system on the 32nd Floor (Moroccanoil Office) as per plans. No change to use, egress or occupancy.
General construction for interior partitions and related finishes for floor, wall & ceiling, as per plans filed herewith. no change to use, bulk, egress, or occupancy. is proposed.
Installation of suspended scaffold for facade work or inspection.
Modifications to the existing sprinkler system on the 17th thru 21st floors (Louis Vuitton - North America Fit Out) as per plans. No change to use, egress or occupancy
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this applicat…
General construction work taking place on 14th and 15th floors as per plans filed herewith. no change in use, egress, or occupancy.
Proposed installation of gas fueled emergency generator filed in conjunction with NB # M00643592-I1.
plumbing modifications on 11th floor as per plans filed herewith. no changes in use, egress or occupancy.
General construction to floor 1 as per plans filed herewith. No change in use, egress, or occupancy.
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
Modifications to the existing sprinkler system on the 6th floor as per plans. No change to use, egress or occupancy.
Propose to install new condenser and air handlers. No change to use, egress or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the partial 14th floor as per plans filed herewith. no change in use, egress, or…
Mechanical systems modifications as per plans filed herewith. no change to use, bulk, egress, or occupancy is proposed
Mechanical changes as indicated on plans.
Sprinkler modifications to take place on the 8th floor as per drawings filed herewith. No change in use, egress, or occupancy.
Exterior facade repairs which include demo and properly dispose of existing marble veneer, remove, patch, waterproof and install new veneer as per plans filed herewith. no change i…
Pl work in suite 1100b filed in conjunction with dob now gc. no change to use, occupancy or egress.
Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.