3,497 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,497 permits
Plumbing fixtures and piping modification as per drawings filed herewith. No change to occupancy, use, or egress.
Facade repairs, scaffold inspections, 3 men letter
Mechanical modifications to take place on the 8th floor as per drawings filed herewith. No change in use, egress, or occupancy.
Sp work filed in conjunction with dob now gc, pl and mh. no change to use, occupancy or egress.
Modification of plumbing fixtures and sprinkler system as per plans filed herewith, no change in use, egress or occupancy under this application.
Mechanical work as shown on plans filed herewith.
Removal of interior non-load bearing partitions at first floor retail space. no change in use, egress or occupancy under this application.
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Plumbing modifications as per plans filed herewith. no change to use egress or occupancy.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy.
Suspended scaffold outrigger system for exterior facade restoration work at 135 west 36 street, manhattan, ny 10018
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Modification to existing mechanical system and related piping. installation of new a/c units as shown on drawings. no change to use, egress or occupancy.
Installation of temporary suspended scaffolds on monorail, per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with…
Preparation Work for Full Demolition - Demolition of West Facade for Abatement Access
Herewith filing for installing a Temporary sprinkler loop as per the plans. No change in use, egress or occupancy.
Work to include furnishing and installing sprinkler heads and branch piping and plumbing fixtures and related piping.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Installation and modification of plumbing fixtures and sprinkler heads with pipes.
Installation of sprinkler heads as per plans filed. no change to use, egress or occupancy.