Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this applicat…
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Installation of hvac and ventilation equipment as per the plans. no change to zoning, use, egress, or occupancy under this application.
Installation of sprinkler heads as per plans filed. no change to use, egress or occupancy.
Installation of temporary suspended scaffolds and material hoist on monorail, per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and…
Work to include furnishing and installing sprinkler heads and branch piping and plumbing fixtures and related piping.
Modification the existing sprinkler system on the 17 floor as per plans. No change to use, egress or occupancy
Seyfarth Shaw-- Modifications to existing sprinkler system on parts of the 31st, 32nd, and 33rd floors.
Erect exterior wall structure for signs as per plan. signs filed under separate application numbers. no change in use, egress or occupancy.
Installation of sprinkler heads as per plans filed. no change to use egress or occupancy.
Modifications to plumbing systems as per plans filed herewith filed in conjunction with NB #M00505081. No change of use, occupancy or egress.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Interior Demolition interior partitions, doors, ceilings and flooring.
Mechanical filing for ductwork & FPBs on the 11 floor tenant space.
Filing herewith drawings indicating the replacement of a Sprinkler Fire Department Siamese connection. No change in use, egress, or occupancy under this application.
Structural modifications to floor 1 as per plans filed herewith. No change in use, egress or occupancy.
Herewith filing for installing a Temporary sprinkler loop as per the plans. No change in use, egress or occupancy.
Interior renovation of the existing 6th floor as per submitted plans.
Proposed installation of new central air conditioning and heating system throughout apartment, including air handlers, duct work and condensers; installation of exhaust fans. No ch…
Proposed alteration to the existing apartment #9C to include new bathrooms, kitchen, plumbing, mechanical and electrical work. No change to use, occupancy or egress under this appl…