3,497 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,497 permits
Proposed alteration to the existing apartment #9C to include new bathrooms, kitchen, plumbing, mechanical and electrical work. No change to use, occupancy or egress under this appl…
Filing herewith drawings indicating the replacement of a Sprinkler Fire Department Siamese connection. No change in use, egress, or occupancy under this application.
Interior Demolition interior partitions, doors, ceilings and flooring.
Installation of sprinkler heads as per plans filed. no change to use, egress or occupancy.
Erect exterior wall structure for signs as per plan. signs filed under separate application numbers. no change in use, egress or occupancy.
Mechanical filing for ductwork & FPBs on the 11 floor tenant space.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Modification the existing sprinkler system on the 17 floor as per plans. No change to use, egress or occupancy
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this applicat…
Modifications to plumbing systems as per plans filed herewith filed in conjunction with NB #M00505081. No change of use, occupancy or egress.
Herewith filing for installing a Temporary sprinkler loop as per the plans. No change in use, egress or occupancy.
Installation of temporary suspended scaffolds, per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this applica…
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
Replace illuminated sign on existing marquee (spin)
Structural modifications to floor 1 as per plans filed herewith. No change in use, egress or occupancy.
Proposed installation of new central air conditioning and heating system throughout apartment, including air handlers, duct work and condensers; installation of exhaust fans. No ch…
Installation of hvac and ventilation equipment as per the plans. no change to zoning, use, egress, or occupancy under this application.