3,508 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,508 permits
Modification to existing Mechanical System as per plans filed herewith. No change in use, egress or occupancy under this application.
Alt-co on 13-14 for assoc. int. non-bear. part. & finishes. no use change on 13 from pa & business to business only w/ incr. in business occupancy. no use change on 14 w/ incr. in…
General construction modifications taking place on the 7th floors as per plans filed herewith. No change in use, egress or occupancy
Exterior modifications as per plans filed herewith. No change to use, egress, or occupancy.
Filing application for minor facade renovation
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Cons…
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Interior renovation existing commercial space with mechanical work on 1st floor. no change in use, egress or occupancy.
Mechanical Systems WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF EXISTINGSPACE on unit 23A. No change to egress, use or occupancy as of right.
Filing herewith for support of openings in masonry walls, support of built up concrete slabs & ramps and support of folding partitions as shown on drawings. no change to use, egres…
Structural framing & new lightweight concrete slab for new pump room on roof. no change in use (u.g.), occupancy or egress.
Filed for interior renovation of commercial space located on the ground floor remove/replace non-bearing partitions & finishes as per plans; no change to use, egress or occupancy.
Proposed interior renovation to existing showroom, no change to use, egress, occupancy or bulk
Modifications to SP system and related piping for existing office space. No change in use, egress or occupancy.
Interior Renovations to the 14th floor Apt#4a as per plans submitted. Structural work/partial demo-new window openings as per plans submitted. No change to use, egress or occupancy…
New ductwork/diffusers connected to existing hvac system. no change to use, egress, or occupancy.
Plumbing modifications as per plans filed herewith. no change to use egress or occupancy.
Modifications to the existing Standpipe System: Installation of (2) new Fire Hose Cabinets and associated SD piping on the 5th Floor as per plans (MUFG Office Renovations.) No chan…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Interior renovation existing commcercial space with sprinkler on 1st floor. no change in use, egress or occupancy.