3,508 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,508 permits
Interior fit-out. new interior partitions. no demolition. no change in use, egress, or occupancy proposed in this application.
Construction of a new pump room on the roof as shown on plans. the mechanical and structural portions will be filed under separate applications. no change in use (u.g.), occupancy…
Install illuminated led sign (sign 6) on wall structure filed under separate application # m01373574-i1 (changeable copy)
Use of Mini Excavator(s) filed in conjunction with job #s M01373547-S1-SE, M01277980-I1-GC, M01277980-S5-ST
Filing herewith mechanical/hvac scope for offices fit-out at 7th and 8th floors as per plans. No change in use, occupancy, or egress proposed under this application.
Sprinkler work on the 17th and 18th floor (Mamiye) as indicated on drawings.
Install illuminated led sign (sign 7) on wall structure filed under separate application # m01373574-i1 (changeable copy)
Application is filed for the plumbing work in conjunction with the alteration application #M01380386-I1.
Modifdication to existing mechaical system and related piping. installation of new a/c units as shown on driawings. no change to use, egress or occupancy.
General construction related to interior renovation of existing conditions to Unit 23 A. No change to use, egress or occupancy.
Full floor demolition of all interior non load bearing partitions and floor finishes on floors 15 16, 20 & 24.
Modifications to the existing sprinkler system on the 34th floor as per plans. No change to use, egress or occupancy.
Minor interior work to do a drop ceiling
Modification to existing Mechanical System as per plans filed herewith. No change in use, egress or occupancy under this application.
Filing herewith for support of openings in masonry walls, support of built up concrete slabs & ramps and support of folding partitions as shown on drawings. no change to use, egres…
Interior renovation existing commercial space with mechanical work on 1st floor. no change in use, egress or occupancy.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Alt-co on 13-14 for assoc. int. non-bear. part. & finishes. no use change on 13 from pa & business to business only w/ incr. in business occupancy. no use change on 14 w/ incr. in…
General construction modifications taking place on the 7th floors as per plans filed herewith. No change in use, egress or occupancy
Exterior modifications as per plans filed herewith. No change to use, egress, or occupancy.