815 issued permits in Murray Hill-Kips Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
815 permits
NYU Langone Health - Kimmel Pavilion Retail pharmacy workroom- Interior modifications on partial first floor as shown on plans filed herewith. No change in egress, occupancy, or us…
Install partitions as per plans.
Mechanical changes as indicated on plans; including changes to existing louver and installation of AC Supplemental Unit.
Installation of industrial rope access for facade inspections.
General construction to take place on the 11th floor Roof as per plans filed herewith. No change in use, egress, or occupancy.
Installation of 7.92 kw solar energy system on roof. No change of occupancy, use or egress.
Architectural changes as indicated on plans.
Interior demo &n reno of non-load bearing partitions, walls, doors, frames, ceiling & finishes as indicated on plans.
Installation of temporary pipe scaffold for exterior repairs as per drawings. scaffold shall comply with ch #33 of the 2022 nyc building code. no change in use, occupancy or egress…
Filing herewith modification to the existing sprinkler and standpipe system as per plans filed herewith. No change to use, egress or occupancy.
Mechanical changes as indicated on plans.; including the installation of 4.5 TON Condensing Unit and (3) Split System AC Units.
General construction modifications taking place to the tower as per plans filed herein. No change in use, egress nor occupancy