815 issued permits in Murray Hill-Kips Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
815 permits
Install fire sprinkler system as per plans.
installation of construction fence to protect site
Facade repairs to include masonry, pointing, lintels, terracotta, sills, concrete patching, scrape/prime/paint exposed steel if necessary
FISP INSPECTION (Facade Inspection Safety Program)INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANSDesignated Primary Site supervisor: Jesus Decola
Installation of 7,000 lb dual personnel hoist cars as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy und…
Bellevue hospital is fitting out an existing 9th floor lab as new it/mdf room. room will be protected with a dedicated single interlocked electronic actuated sprinkler system, with…
Tisch Hospital - Limited mechanical alterations to restroom and shower areas on the 7th, 16th, and 17th floors, including exhaust and air distribution modifications. No change to u…
Filing for selective Demolition/Construction and protection related to a Mechanical Equipment upgrade and Structural steel to support ducts to concrete slab.
Interior renovation of exisitng UG6 Easting and drinking establishment as per plan. Removal of interior finishes and, interior construction and new door on storefront as per plan.…
Interior renovation of existing eating and drinking establishment on the basement and first floor as per CO 120819061. No changes to use, egress or occupancy.
Herewith filing sprinkler modifications for NYU Langone HCC- Cath Lab Equipment HCC14 Project. No change in use, egress, or occupancy.
Filing for selective Demolition/Construction and protection of Partial Cellar through 10th floor related to a Mechanical Equipment upgrade.
Application filed for add new gas equipment in a exist. restaurant. plumbing work is filed in conjunction with #m01106366
Replace pl fixtures w/ new @ existing roughing (2 lav, 2 wc, 1 tub, 1 kitchen sink), relocate pl fixtures w/ new (1 dw), & install new pl fixtures @ existing roughing (1 shower). e…
Msb cellar - modifications to an existing sprinkler system as per plans filed herewith. no change in use, egress, or occupancy.
To remove existing sprinkler system total of 91 sprinkler heads and install new temporary sprinkler system with 65 upright sprinkler heads. as per drawings filed here within. proje…