815 issued permits in Murray Hill-Kips Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
815 permits
Installation of temporary roof protection as per plans. temporary protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applic…
Proposed installation of an ADA accessible ramp
Installation and use of temporary sidewalk shed equipment as per plans filed herewith. no change to use, egress or occupancy under this application.
Facade Inspection via Industrial Rope Access
Proposed installation of a temporary sidewalk shed as per plans submitted. Work shall comply with 2014 building code, chapter 33. No change in use, egress or occupancy.
Sprinkler work on associated piping as shown on plans filed herewith at construction floor 13/marketing floor 16 & construction floor 14/marketing floor 17. including install and r…
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Facade repairs as indicated on plans.
Masonry facade work as per plans, including addressing the conditions cited in ECB Violation 35674111L and Violation 39083802L. No change to use, egress, or occupancy.
.herewith filing for modifications to the mechanical system at the 16th flr infusion center as per plans. no change in use, occupancy, or egress under this application.
Underground plumbing work associated with new building construction
At first floor, modification to egress and egress door/facade assembly as per ccd1 #pda00004108. alternate egress only approved as temporary egress durng lobby renovation and is to…
Herewith filing for interior renovations at the 16th flr infusion center per plans. no change in use, occupancy, or egress under this application.