810 issued permits in SoHo-Little Italy-Hudson Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
810 permits
Interior base building improvements to install new connecting convenience stair in retail space including removal work, construction of new rated and non-rated partitions, and stru…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Proposed interior renovation works on 1st floor as shown on plans. the plumbing, mechanical, and structural work type shall be done under separate subsequent applications.
Proposed structural work to install steel lintel, no change in use, egress and occupancy.
Interior renovation of apt 2re. partition changes to non-load-bearing walls as per plans. no change in use, occupancy, or egress.
Interior and exterior renovation on the 6th floor, mezzanine, penthouse and roof per plans filed herewith. No change in use, egress or occupancy.
Mechanical duct work in conjunction with new bathroom addition
Rope access installation for rear facade access and inspections
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this…
Propose mechanical work as per drawings filed herewith.
Removal of sidewalk, curbs, asphalt pavement, utilities and site preparation. Excavation and installation of sewers and utilities and curbing, sidewalk, and asphalt pavement.
Propose to file for installation of (23) LG condenser units. No change in use, egress or occupancy.
Resolution of existing ecb violation#39137421z of extension for commercial area at 1st floor. convert rear fire escape into fire balcony. construction work as per plan.
Installation of sidewalk shed as indication the attached drawings. There are no changes in use, egress or occupancy.
Mechanical work as per plans filed herewith. no change to use, egress or occupancy
Mechanical modifications taking place on 4th & 5th floors as per plans filed herewith. no change in use, egress, or occupancy.
Interior renovation of existing retail space. No change to use, egress, or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
General construction taking place on 4th & 5th floors as per plans filed herewith. no change in use, egress, or occupancy.