810 issued permits in SoHo-Little Italy-Hudson Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
810 permits
Construction equipment - scaffold proposed installation of pipe scaffold for remedial repairs as per plans. pipe scaffold shall comply with chapter#33 of 2014 the ny building code.…
Structural modifications taking place on the 2nd floor as per plans filed herewith. No change in use, egress or occupancy
Installation of pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Proposed installation of temporary light duty pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress u…
Modifications to existing structural systems to include reinforcement of existing framing in existing commercial space. no change to use, occupancy or egress
Painting
General construction modifications taking place on the 5th floor as per drawings filed herewith. no change in use, egress or occupancy.
Repair to existing concrete floor inside a commercial space.
Removal of existing toilet, lavatory and associated piping. Installation of new toilet , lavatory, pantry sink, dishwasher, funnel drains and associated piping as related to the ge…
Mechanical modifications taking place on the 5th floor as per drawings filed herewith. no change in use, egress or occupancy.
Repair and replacement of the sidewalk vault structure.
Plumbing work proposed for an existing commercial space. No change of use, occupancy or egress.
Sprinkler work proposed for an commercial space. No change of use, occupancy or egress.
Interior renovation of existing commercial space. no change to use, occupancy or egress
Installation of new transparent fence around perimeter of rooftop to protect occupants of existing eating and drinking establishment as shown on the drawings filed herein. no chang…
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
Renovation consists of minor partitions and interior finish work as per plan.
Modifications to existing mechanical systems in existing commercial space. no change to use, occupancy or egress