1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Proposed plumbing work in conjunction with general construction permit. modification to existing plumbing as per existing drawings.
Filed herewith for plumbing work in unit 9cd, no change to use egress or occupancy
installation of heavy duty sidewalk shed and pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Apartment renovation (apt 1c) work to include removal and installation of partitions, doors, ceiling, millwork, finshes and related construction as per plans filed herewith. no cha…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
3.3 south: modification to existing standpipe system in conjunction with sprinkler application # m01130126-s4
Modification of existing plumbing system in apt. #15A, as per plans filed herewith. No change in use, egress or occupancy.
Structural work as per plans. no change in use, egress or occupancy
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole
Change door swings on 2nd floor, and to Increase occupancy on 2nd and7th floor for existing spaces and file for PA spaces. Show proposed Fitness room on 5th floor.
Facade repairs as per plans been filled herewith.
Herewith filing for installation on non load bearing partitions. no change in use, egress, or occupancy
Exterior work in conjuction with renovation of existing penthouse apartment phw. construct new exterior window openings. install new structural steel lintels for new window opening…
Filed herewith to obtain equipment use permits / certificate of completion to address work with out permit violations for existing condensing unit. DOB Violation #060497C08JG01 OAT…
Capped Guest Bathroom and new Clothes Washer on the third floor
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Install fire sprinkler system as per plans
Renovate existing penthouse apartment phw. demolish & construct non-structural walls, doors, fixtures & finishes. no change to use, egress or occupancy.
Hereby filing structural and foundation work for new elevator shaft extension. In conjunction with enlargement under Alt-1#121208683. please see alt-1 for zoning and any enlargemen…