1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Interior renovation of apartment 7C associated with the GC scope. No change in use, egress, or occupancy under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live l…
Interior renovations of apartment 7s; work to include removal and installation of interior partitions & doors. no change to occupancy, use, or egress.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc…
Install exterior illuminated wall sign (maryjane cannabis co)
General constrution modifications taking place on floors 3, 4, 5 (4, 5, 6 marketing), per drawings filed herewith. no change in use, egress or occupancy.
Renovation of apt 1a, lobby, first floor, and cellar. replacement of existing elevator bulkhead. no change in use, egress, or occupancy.
Northwell Lenox Hill: minor architectural scope in conjunction with Central Sterile Supply HVAC upgrades, as per plans filed herewith. No change in use, occupancy, or egress.
Interior renovation to install new air conditioning systems to serve the residence and revision to the existing steam radiators. No change to egress, occupancy, or use.
DevHUB Consultation 7.18.2025. Application filed for new openings and repair on existing facade and select interior demolition as noted in plans. No change in use, egress or occupa…
Herewith Filing Plumbing Scope in conjunction with interior renovations as per plans. No change in Use, Egress or Occupancy is proposed under this application.
Repair slates on front facade.
Alteration Type II for interior renovation and combination of two apartments 3A & 3F to be 3AF. Remove one (1) kitchen & renovate one (1) bathroom as per plans. No change to Use, O…
Filing for the facade restoration as shown on drawings filed herewith. no change in use, egress, or occupancy.
- replace 1 dishwasher- replace 1 sink- replace 1 tub with shower-replace 2 tubs- replace 3 toilets- replace 1 gas stove- relocate 1 lav- install new 1 lav- replace 2 lavs- install…
Plumbing work filed inconjunction with renovation of an existing apartment 15b.
No change in egress, occupancy, or use under this application, scope of work to include minor renovation to existing eating establishment, new finishes, new non bearing wall, millw…
Installation of a suspended scaffold and material hoist for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Interior alterations to existing ground floor commercial space to include non-load bearing demo, partition and finishes work. no change to use, occupancy or egress
Filing to propose renovations to 1020 fifth avenue, apartment 12 and relocated and replaced fixtures.