1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Herewith Filing Structural Modification as per plans a small portion of the 2nd floor slab is being reinforced to support AHU. No Change in Use, Egress or Occupancy is proposed und…
Herewith Filing Interior Renovations at 1st and 2nd Floors as outlined in plans.
Installation of three (3) new condensing boilers and associated pumps and suction diffusers on the 37th Floor (CO)/ M3 (Mktg) and install drain, flow bypass valve, differential pre…
Installation of temporary roof protection as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2014 the ny building code.
Interior mechanical work in existing apt 4b including replacement of existing water source heat pump ahus and modifications to toilet exhaust ductwork. no change in use, egress, or…
Interior tenant scope for Audemars Piguet retail store at the cellar and 1st floor as per drawings submitted herewith. Includes new partition walls, finishes, fixtures, and furnitu…
Heavy duty sidewalk shed during bldg alteration, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Installation of a temporarily heavy-duty sidewalk shed and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress a…
Herewith filing for wood joists reinforcement from water damaged on 2nd floor bathroom as per plans filed herewith. no change in use, occupancy or egress.
Structural updates for Audemars Piguet per plans filed herewith.
Interior renovation of existing partment
Mechanical work in conjunction with alt-co #m00895355-i1.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycbc
Renovation of an existing apartment 15b. demolition and construction of partitions, interior renovation of kitchen, and bathroom. all work is interior. plumbing work filed under se…
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Proposed to renovate the 1st floor retail store, work will include: new partitions, finishes, cabinets, casework & store fixtures. no change in use, egress or occupancy under this…
Remove hvac equipment on floor 06 and roof. no change to use, egress or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…