2,091 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,091 permits
Support of excavation scope as related to townhouse renovation as per plans filed herewith.
plumbing work filed in conjunction with apartment renovation
Renovate exist. retail store for a new florist. Repair walls and clng where required, and paind. minor partitions, new equipment, shelving, and lighting. No change in use, egress o…
New rear extension and elevator and stair bulkhead; combine with other buildings on the lot and change use from residential to offices. no dwelling units in the building will be oc…
Installation of suspended scaffold for facade inspection/repair.
Installation and use of temporary mini crane as per plans filed herewith. no change in use, egress, or occupancy.
Hereby filing for the interior renovation of apartment 15lm located on the 15th floor. no change to use, egress or occupancy.
Change use of building to community facility. Enlarge building on floors 3 thru 6. Install new egress stair.
Mechanical modifications and assoicated duct work as per plans. no change in use egress or occupancy.
Interior renovation of apt 10a filed in conjunction with dob now pl. no change to use, occupancy or egress.
Removal of non-structural partitions, ceilings, light fixtures, flooring, and paint perimeter walls.
Installation of multizone Split Heat Pump Condensing Units and related air handlers as per plans attached herewith. No change in use, egress and occupancy.
Installation of a temporary engineered enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appl…
Convert two existing multi-family buildings into a single family residence including vertical enlargement at 4th floor and horizontal enlargement at 1st floor/basement.
Installation of roof protection as per plans. no change in use occupancy or egress under this application.
Installation of suspended scaffold for facade work or inspection.
Minor alteration per plans filed within. No change to use, egress, or occupancy.
the installation of a 4 ton Mitsubishi City Multi split AC system (ACC1 outdoor unit connected to all 3 indoor units)
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. sidewalk shed and pipe scaffolding shall comply with chapter #33 of the 2022 code no change in use, egress o…