1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Industrial rope access for facade inspections.
Plumbing work related to apartment renovation as per plans filed herewith.
Install temporary core sprinkler protection and remove existing sprinklers as per plans.
Renovation of an existing dwelling unit. Architectural work as per plans. No change of use, occupancy or egress.
Heewith filing for modifications to the plumbing fixtures as per plans. no change to use occupanyc or egress under this application.
Pl fixtures in apt 5g filed in conjunction with dob now gc . no change to use, occupancy or egress.
Temporary construction fence filed in conjunction with conversion of existing building to a one-family with 1-story basement extension.
Installation of new plumbing include sanitary, vent, domestic h/c water piping, hot water heater. new branch mains and sprinkler distribution on first floor, mezzanine, and cellar.
Interior renovation fitout of retail space. no change of use, egress or occupancy.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Mechanical work filed in conjunction with renovation of ex. apt #15a. remove existing new fan coil units and replace with new, connecting to existing building hw/cw piping. no chan…
Mechanical modifications on cellar, 1st, 2nd floor and installation of unit on roof as indicated on plans filed herewith.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appl…
Installation of temporary system stair per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Replace plumbing fixtures with new at existing roughing (2 lav, 2 wc, 1 tub, 1 shower, 1 sink, 1 dw) and install new plumbing fixtures at new roughing (1 w/m) at apt 11c on the 11t…
Mechanical work associated with new Tenant build out for Initio Parfumes. No change in egress, use or occupancy
Partial renovation to ex. apt. at the 15th fl. demolish and construct non-structural partitions, fixtures and finishes. replace windows & ext. doors in ex. openings. minor repair a…
Modifications of existing mechanical system. Work to include installation of a new air handler and condenser & related ductwork; and relocation of existing air handler & related du…
Structural work in connection with retail renovation an dunnage work
Filing application for the interior renovation of apt. 19p on the 19th floor as per plans submitted herewith. no change in use, egress or occupancy.