1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Installation of temporary indoor structures consisting of a scenic arbor, a decorative trellis, and a performance platform.
Proposed Interior plumbing modification at existing retail space. No mechanical work is proposed. No change in Use, Egress, or Occupancy is proposed in this application.
Respectfully request to file Post Approval Amendment (PAA P2) for word change (Back-flow Preventer location- Cellar. No change in use, egress, or occupancy.
Change of use of dwelling unit to community facility use. general construction work to include reconfiguration of partitions and doors.
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Facade Repairs. No change in use, egress, or occupancy.
Install replacement cooling tower as per plans, no change in use, occupancy or egress
Facade and local law repairs as indicated on the plans filed herewith. no change in use, egress, or occupancy
Foundation work as per plans filed.
General construction for 12th floor apartment renovations & window replacement, penthouse mechanical room, & dep required acm abatement as per plans filed herewith. no change in us…
Structural work for alteration of existing building as per plans filed.
interior demolition of cellar through 5th floors. No structural demolition.
Construction fence for reatil store
Repair/replace facade as necessary to include masonry, pointing, lintels, and masonry corner reconstruction, as per drawings
Installation of temporary supported scaffold as per plan. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Plumbing work as per plans attached herewith. No change in use, egress and occupancy.
Herewith filing for apt 3a interior renovation. work is to modify plumbing fixtures as per plans filed herewith. no change in use, occupancy or egress.
Installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Perform minor exterior demolition & construction inconjunction with penthouse a renovation. replace terrace doors, windows & pavers. modify existng masonry openings. install awning…
Installation of new split system unit with associated ducts and piping in Unit 12 AE. Remove and replace existing PTAC units.