1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Herewith filing underpinning work, as per plans submitted. Filed in conjunction with ALT 1#: 121330327 and SOE#: M00852650.
Herewith filing support of excavation to provide foundation bench, as per plans submitted.
Structural slab repairs and associated framing on 3nd floor as per plans filed herewith. No changes in use, egress or occupancy.
Plumbing work associated with interior renovation of an existing class a apartment including new plumbing fixtures, new sanitary lines, new gas line. no change in use, egress, or o…
Installation of mechanical HVAC system, ventilation duct work. Mechanical scope only.
Installation of 370' new sidewalkshed as indicated on plans. there will be no change in the use, egress, or occupancy under this application
Installation of suspended scaffold for facade work or inspection.
Installation of temporary shoring as indicated on plans submitted herewith. there is no change in use, egress or occupancy.
Installation of temporary alternate platform and temporary system scaffold stair as per plans filed herewith. filed in conjunction with construction application m00520677 and struc…
Foundation, concrete slab and masonry work and Structural framing and reinforcements for alteration.
New rear extension and elevator and stair bulkhead; combine with other buildings on the lot and change use from residential to offices. no dwelling units in the building will be oc…
Installation of suspended scaffold for facade work or inspection
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. sidewalk shed and pipe scaffolding shall comply with chapter #33 of the 2022 code no change in use, egress o…
Hereby filing for the interior renovation of apartment 15lm located on the 15th floor. no change to use, egress or occupancy.
Mechanical modifications and assoicated duct work as per plans. no change in use egress or occupancy.
the installation of a 4 ton Mitsubishi City Multi split AC system (ACC1 outdoor unit connected to all 3 indoor units)
Installation of roof protection as per plans. no change in use occupancy or egress under this application.
Removal of non-structural partitions, ceilings, light fixtures, flooring, and paint perimeter walls.
Installation and use of temporary mini crane as per plans filed herewith. no change in use, egress, or occupancy.