1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Installation of suspended scaffold for facade work or inspection.
Foundation, concrete slab and masonry work and Structural framing and reinforcements for alteration.
Installation and use of temporary mini crane as per plans filed herewith. no change in use, egress, or occupancy.
the installation of a 4 ton Mitsubishi City Multi split AC system (ACC1 outdoor unit connected to all 3 indoor units)
Removal of non-structural partitions, ceilings, light fixtures, flooring, and paint perimeter walls.
Change use of building to community facility. Enlarge building on floors 3 thru 6. Install new egress stair.
Interior renovation of apt 10a filed in conjunction with dob now pl. no change to use, occupancy or egress.
Hereby filing for the interior renovation of apartment 15lm located on the 15th floor. no change to use, egress or occupancy.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. sidewalk shed and pipe scaffolding shall comply with chapter #33 of the 2022 code no change in use, egress o…
Filing for facade repair for floors 001-005 as per plans filed herewith. no change in egress, use or occupancy.
Plumbing scope associated with renovation/ repair of existing elevator shaft.
Minor alteration per plans filed within. No change to use, egress, or occupancy.
Mechanical modifications and assoicated duct work as per plans. no change in use egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Partial demolition of plumbing fixtures and associated piping as per plans
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary material hoist as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicati…
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this ap…
Filing subsequent plumbing application for new and replaced fixtures. No gas work under this application. Removal of existing electric cooking range.