1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Installation of industrial rope access for facade inspections.
Mechanical work associated with the new chillers installation at the Frick Museum. No change of use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Interior renovation of apartment16-b as per plans filed herewith. no change to use, egress and occupancy.
Install two split heat pump systems. condenser outside the building and air handlers in kitchen with a coil installed in the existing makeup air unit
General construction interior only renovation of existing bathrooms and kitchen in apartment 31c on the 31st floor. as per plans filed. no change to use, egress,or occupancy.
Structural work related to existing building alteration m01153426-i1.
Filing for the installation of mechanical equipment. no chage in use or egress under this application.
Foundation and earthwork related to the construction of a new high rise residential building
Minor demolition with intallation of new partitions, doors, suspended ceilings and finishes on the third (3rd) floor, apt. 3f as per plans. no change to use, egress or occupancy.
Facade repairs as shown on plans no change to egress, occupancy or use.
File pl worktype in conjunction with job#
Mechanical work filed in conjunction with renovation and combination of units r18a/l with units r18 j/k & ph18d. architectural work filed under # 121209049. new certificate ofoccup…
Installation of outrigger beam to perform facade repairs and facade inspections
Installation of a heavy duty sidewalk shed to include storage
structural work associated with the townhouse renovation, as shown on plans filed herewith. No change to use, egress, or occupancy.
Mechanical work in conjunction with apartment renovation.
Combine upper level apartment 2w with apartment 3w. work includes second floor framing new opening for spiral stairs and closing old staircase opening. no change in egress or occup…
Filing herewith structura work as per plans: installation of new sub-framing and concrete pad for acid neutralization tank at 4th floor & installation of new reinforcement, sub-fra…
Installation of suspended scaffold for facade work or inspection.