2,107 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,107 permits
General construction for 12th floor apartment renovations & window replacement, penthouse mechanical room, & dep required acm abatement as per plans filed herewith. no change in us…
Structural work for alteration of existing building as per plans filed.
8369 - Replacement of a sidewalk vault structure. No change in egress, use, or occupancy.
Facade Repairs. No change in use, egress, or occupancy.
Proposed Interior plumbing modification at existing retail space. No mechanical work is proposed. No change in Use, Egress, or Occupancy is proposed in this application.
Install replacement cooling tower as per plans, no change in use, occupancy or egress
Installation of temporary indoor structures consisting of a scenic arbor, a decorative trellis, and a performance platform.
Respectfully request to file Post Approval Amendment (PAA P2) for word change (Back-flow Preventer location- Cellar. No change in use, egress, or occupancy.
interior demolition of cellar through 5th floors. No structural demolition.
Plumbing work proposed for an existing apartment. No change to use, occupancy or egress.
Plumbing work as per plans attached herewith. No change in use, egress and occupancy.
Installation of temporary supported scaffold as per plan. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appl…
Removal and installation of non load bearing partitions, fixtures and finishes and renovation of kitchen and bathrooms in Unit 12 AE.
Repair/replace facade as necessary to include masonry, pointing, lintels, and masonry corner reconstruction, as per drawings
Installation of new split system unit with associated ducts and piping in Unit 12 AE. Remove and replace existing PTAC units.
Installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Mechanical modifications as per plans. no change in use, egress or occupancy.
Herewith filing for apt 3a interior renovation. work is to modify plumbing fixtures as per plans filed herewith. no change in use, occupancy or egress.