1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Mechanical work associated with the renovation of an existing 3rd floor apartment. There is no change to use, egress, or occupancy proposed.
Hereby filing for work at common halways and foyer. new flooring, new wall treatments, new lighting, soffits at some locations.. no change in use or occupancy.
Renovation of an existing building. change in use to a single family residence.
Installation of Fence as shown on plans filed herewith.
Rremodel apt 2c on the second floor. no change in use, egress or occupancy.
Herewith filing for modifications to the existing sprinkler system on the 7th floor as per plans. no change to use occupancy or egress.
Interior renovation of 8th floor apt with minor demolition of non-load bearing partitions. New finishes, non-load bearing partitions, and ceilings. No change in egress, occupancy o…
Installation of a temporarily heavy-duty sidewalk rated 600 PSF for material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, eg…
Herewith filing support of excavation for tunnel installation per plans.
Non-structural interior demolition work as shown on plans filed herewith. no change in use, egress of occupancy under this application
Remove and replace existing glass enclosure at existing sunroom. No change in occupancy, use or egress.
Facade repairs as per plans submitted herewith. there is no change in use egress or occupancy.
Mechanical work filed in conjunction with alt i application m00661352.
Hereby filing for work at common halways and foyer. new flooring, new wall treatments, new lighting, soffits at some locations. no change in use, egress or occupancy.
Installation of temporary material hoist and its runback structure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupa…
Interior Renovations of Apartment Unit 10C as per plans. No change is Use, Egress or Occupancy under this application.
Facade restorations as per plans filed. No change in occupancy, use or egress.
Filing application for the interior renovation work at apartment 8b on the 8th & 9th floors. no change in use egress or occupancy.