1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Hereby filing for the interior renovation of existing apartment 8d located on the 8th floor. no change to use occupancy or egress.
Renovation and conversion of an existing two-family home to a single family home. A new certificate of occupancy will be obtained.
Service Entrance Ceiling slab repair on the basement floor as indicated on the plans filed herewith. No change in use, egress, or occupancy.
Renovation of an existing apartment# 35B on 35th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or oc…
mechanical equipment will be used from exterior and placed on grade. Chute will be built up to assist with loading out of demo debris
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022building codes, chapter 33. no change in use, egress or occupancy.
Interior renovation of apartment 19c as per plans filed herewith. no change in use, egress, or occupancy.
Herewith filing interior plumbing modifications for the 5th flr apt 5a unit per plans.
Install new chimney liners and draft inducers as per plans. no change to use, occupancy or egress.
Filing for gut renovation of Apartment 12CD. No change to Use, Occupancy, and Egress.
Miscellaneous replacement of brick masonry, miscellaneous replacement of terra cotta, repair of structural steel columns and beams as per plans. no change in use egress or occupanc…
Plumbing work in apt 12c
mechanical means will be used to assist with exterior demolition. Chute will be built up to load out debris from floor to floor
mechanical equipment will be used to assist with demolition from exterior, and chute will be built up to lower debris from floor to floor
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Proposed installation of a heavy duty (300PSF) temporary sidewalk shed as per plans submitted. Work shall comply with 2022 building codes, chapter 33. no change in use, egress or o…
mechanical equipment will be placed on grade, and chute will be installed to lower debris from floor to floor
Facade Repair Project as per plans. No change to use, egress, or occupancy.
Repair & partial replacement of finishes due to water damage from internal leakage on basement, first & second floors. Removal of ECB violations.
Plumbing work filed in conjunction with apartment#8 renovation as per plans file herewith. No change to, use, egress or occupancy.