1,780 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,780 permits
Renovation and conversion of an existing two-family home to a single family home. A new certificate of occupancy will be obtained.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Converting walk-up building with 11 apartments into a one-family and proposing horizontal enlargement as per plans submitted as per plans submitted. new co will be obtained.
Hereby filing for the interior renovation of existing apartment 8d located on the 8th floor. no change to use occupancy or egress.
Proposed installation of a heavy duty (300PSF) temporary sidewalk shed as per plans submitted. Work shall comply with 2022 building codes, chapter 33. no change in use, egress or o…
Renovation of existing 2 bedroom apartment. reconfiguration of kitchen. minor reconfiguration of interior non-rated partitions. renovation of two bathrooms. no change to egress or…
Repair & partial replacement of finishes due to water damage from internal leakage on basement, first & second floors. Removal of ECB violations.
mechanical means will be used to assist with exterior demolition. Chute will be built up to load out debris from floor to floor
Plumbing work for tenant fit-out of Jersey Mike's restaurant at this location. No change in use, egress, or occupancy under this application.
Plumbing work file in conjunction with single family dwelling renovation.
Filing for gut renovation of Apartment 12CD. No change to Use, Occupancy, and Egress.
Renovation of an existing apartment# 35B on 35th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or oc…
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022building codes, chapter 33. no change in use, egress or occupancy.
Install new chimney liners and draft inducers as per plans. no change to use, occupancy or egress.
mechanical equipment will be placed on grade, and chute will be installed to lower debris from floor to floor
Plumbing work for renovation in apartment 4/5re
mechanical equipment will be used from exterior and placed on grade. Chute will be built up to assist with loading out of demo debris
mechanical equipment will be used to assist with demolition from exterior, and chute will be built up to lower debris from floor to floor
Mechanical work in conjunction with interior renovation to apt. 9g on the 9th floor. as per plans. no change in use, egress, or occupancy under this application.
Plumbing work in apt 12c