2,107 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,107 permits
Interior renovation & combining of 2 adjacent apartment units (9a & 9b) at 9th floor per plans. note that combining 2 apartments must comply with tppn 03/97.
Plumbing work filed in conjunction with renovation of existing apartment #2 on the 2nd floor. install plumbing fixtures and associated piping. associated construction filing m10234…
Interior renovation to apartment unit #15c no change in means of egress, use or occupancy
Installation of Temporary structure for Mock-up for LPC purposes only.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live l…
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Replace hvac rooftop units as per plans. no change in use, occupancy, or egress.
Structural work associated with exterior through wall penetration for a through wall condenser unit.
Proposed non-structural interior modification of existing retail space for new cannabis dispensary. no change in use, egress, or occupancy is proposed in this application.
Plumbing work filed in conjunction with the renovation of an existing dwelling unit. No change of use, occupancy or egress.
Renovation of 2-bedroom, 3 bath apartment including non-structural partition demolition, new partition work, 3 renovated and 1 new bathroom, kitchen, laundry rm. No change to use,…
Installation of (2) new domestic water booster pumps and related modification of existing domestic water system. no change in egress or occupancy.
Minor interior renovation of apt #4/5a including kitchen, bathroom, minor layout revisions and finishes. filed in conjunction with m01350702-i1 and related mechanical filing m01251…
General construction to renovate apt 3b on the 3rd floor. work will include new partitions and finishes, and new plumbing fixtures. no change in use, egress, or occupancy under thi…
Interior renovation of apt #2f per plans filed herewith. work includes removal and replacement of existing plumbing fixtures. no change in use, egress, or occupancy.
Suspended Scaffold installation as per plans filed herewith.
Interior mechanical work in existing apt 4b including replacement of existing water source heat pump ahus and modifications to toilet exhaust ductwork. no change in use, egress, or…
Propose to install non-advertising sign. No change in use, egress, or occupancy.