754 issued permits in Upper West Side-Lincoln Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
754 permits
interior renovation of the existing cafe space to accommodate THE DROP EATERY as shown on plans filed herewith. No change to use, egress or occupancy.
Replacment of hvac units in the mech. room, outside space, and roof with a total capacity of 32.5 tons. no change to egress, use, or occupancy.
Sprinkler work in conjunction with layout for new Tenant Alo No change in egress, use or occupancy.
Structural modifications to reinforce structure at location of hatch door. no change to use, egress or occupancy.
Interior renovation of townhouse as shown on plans, to include structural work related to renovating bathrooms, bedrooms, kitchen, family room, study and home library.
Modify mechanical ductwork along with a/c unit
AT&T - Replacement of antennas with removal and installation of RRH units on roof. Removal, retrofit and installation of cabinets on existing equipment platform on roof. All work i…
Proposed interior renovation to existing commercial space. no change in use, egress, or occupancy.
install two (2) new gas fired water heaters, piping, area drains and all related work as per plans.
Plumbing work in existing commercial space to be occupied by Alo: per plans submitted herewith. No change in egress, use or occupancy.
Replacement of hvac units in mech. room, outside space, and roof with a total capacity of 45 tons. no change to egress, use, or occupancy.
Facade repairs, including brick replacement, lintel cleaning, lintel replacement, and coping replacement. no change in use, egress or occupancy.
Replacement of 3 ton split system on floor 005. no change to egress, use, or occupancy.
Installing pocket doors to convert Bedroom and Living Room into 2 Bedrooms. No structural work involved.
Installation of new gas fired hot water heater with (1) storage tank. no change to use, egress, or occupancy.
Temporary structures for a groundbreaking ceremony at Damrosch Park. Removed at the end of the programing. No changes to existing structures, use or egress.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Herewith filing for interior renovation of cellar and basement for Macaulay College to update the number of allowed occupancy, including restroom renovations on cellar, 2, 3 and 4t…
General construction to renovate apt 9e on the 9th floor. work will include demo of non-load bearing partitions, new partitions, & finishes, and new plumbing fixtures. no change in…