Other Permits in Manhattan, New York
11,314 other permits filed recently
11,314 permits
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Filing herewith modification to the existing sprinkler and standpipe system as per plans filed herewith. No change to use, egress or occupancy.
Installation and use of Temporary Pipe Scaffold equipment as per plans filed herewith. No change to use, egress or occupancy under this application.
Exterior restoration as per plans filed herewith, No change to use, egress or occupany
Chny central sp: sprinkler modifications throughout the existing babies hospital central building as indicated on plans filed herewith.
Installation of temporary easy scale platform as per plans. no change in use, egress or occupancy.
Installation of industrial rope access for facade inspections.
Supported Scaffold
Installation of pipe scaffold as per plans. no change in use, egress or occupancy.
Suspended scaffold outrigger system for exterior facade restoration work at 1470 1st avenuemanhattanny 10075
Installation of industrial rope access for facade inspections.
Structural work associated with reinforcement of sidewalk framing and replacement of sidewalk flags. no change to use, occupancy or egress
Removal of (1) existing Fire Hose Rack and Piping back to riser, Install one (1) new valve w/ tamper switch at riser on the 32nd Floor (CO)/ 37th Floor (Marketing) as per plans (LL Work.) No change to...
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filing for the installation of: one 1.75 ton heat pump unit, one (1 ) ton air handler unit, one 0.75 ton air handler unit. no change in use, egress, or occupancy.
Installation of temporary suspended scaffold equipment.
Construction fence installed per plans, no change in use, egress oroccupancy
Provide temorary core sprinkler protection (tcsp) in accordance with nycbuildings bulletin 2020-012.
Installation of heavy duty sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under th...
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.