Other Permits in Manhattan, New York
11,231 other permits filed recently
11,231 permits
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Installation of temporary construction fence in conjunction with nyc dob job # 123354618. no change in egress, use, or occupancy.
Modification the existing mechanical system as per plans. No change to use, egress or occupancy
Renovate (3) existing bathrooms in apartment #25D. No change in use, egress or occupancy.
New partition and ceiling work, new rear yard steps to cellar, install residential elevator
Suspended Scaffold for Facade Restoration as Shown on Plans
Suspended Scaffold for Facade Restoration as shown on plans
Structural modifications as per plans. no change in use, egress or occupancy.
Replace metal chimney.
Installation of heavy duty side walk shed.as per plan.
Installation of new water cooled VRF system, kitchen, dryer, and toilet exhaust system in Apartment #3/4 N on the 3rd and 4th floor. No change to use, egress, or occupancy.
Installation of a temporary chain link construction fence filed in conjunction with M00516712 at NYCHA Building #5 as per plans filed herewith.
Mechanical work taking place on the 21st floor as per plans filed herewith. no change in use, egress, or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Propose to file for mechanical work for two (2) air-cooled packaged units with ductwork. No change to use, egress or occupancy.
To resolve ecb violation #39529235h, #39526338r, #39526339z by removing illegal construction fence. no change of use, egress or certificate of occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Install thru-wall AC units, associated GC work and components, as per plans filed herewith. No change to use, egress or occupancy.
Installation of a heavy duty sidewalk shed as per plans during general construction work. no change in use, egress or occupancy. sidewalk shed to comply with chapter 33 of nyc building code of 2022.