Other Permits in Manhattan, New York
11,231 other permits filed recently
11,231 permits
Installation of a heavy duty sidewalk shed as per plans during general construction work. no change in use, egress or occupancy. sidewalk shed to comply with chapter 33 of nyc building code of 2022.
Suspended Scaffold for Facade Restoration as shown on plans
New partition and ceiling work, new rear yard steps to cellar, install residential elevator
Installation of temporary plywood fence as per plans during construction. no change in use, egress or occupancy. fence shall comply with chapter 33 of nyc building code of 2022.
Installation of sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of a heavy duty sidewalk shed as per plans during general construction work. no change in use, egress or occupancy. sidewalk shed to comply with chapter 33 of nyc building code of 2022.
Reconfigure existing ductwork runs and install 2 new diffusers. re-locate thermostats.
Sprinkler work on the 6th and 7th floor (Sony/Sharp) as indicated on drawings.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Filing for the installation of a new accessible ramp within the property line. Replace and relevel existing concrete walkway within the property line. No change to use, egress or occupancy.
Provide slab on grade, ramps, stairs, grade beams and spread footing as per plan.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of industrial rope access for facade inspections.
Modifications to the existing sprinkler system on the Sub-cellar level 4, 10th & 11th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.
Horizontal enlargement of the first floor in the existing building. Change of use to storage in cellar and retail at 1st floor, and work on the second floor per plans. Rear wall work on FL 1 and 2.
Modification/additions to existing supply and return air ductwork, diffusers and transfer ducts. No change in use, egress or occupancy under this application.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc
Alt Co filed to include accessory Terrace on CO and to increase population on the 20th construction/ 21st marketing floor
Mechanical work associated with the new chillers installation at the Frick Museum. No change of use, egress or occupancy.
Architectural modifications on the 12th floor (Suite 1200) as per plans. No change to use, egress or occupancy.