Other Permits in Manhattan, New York
11,365 other permits filed recently
11,365 permits
Filing for the installation of mechanical equipment. no chage in use or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Application filed for the conversion and enlargement of existing building.
Interior demo & construction of non-load bearing partitions, walls, doors, frames, ceiling and finishes as indicated on plans.
Suspended Scaffold for Facade Restoration as shown on plans
General construction and structural work filed to reflect changes of alt i application #122938296 in dob bis.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Temp Construction Fence in conjunction with job M00821048
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporary chain link construction fence filed in conjunction with M00516712 at NYCHA Building #5 as per plans filed herewith.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation and use of temporary supported scaffolding as per plans filed herewith. no change to use, egress or occupancy under this application.
Installation of scaffold for exterior work at building facades
Install two split heat pump systems. condenser outside the building and air handlers in kitchen with a coil installed in the existing makeup air unit
Mechanical modifications as per plans filed herewith. no change in use, egress or occupancy.
Remove & provide new lintel and clip angles.
Installation of heavy duty side walk shed.as per plan.
Modifications to the existing sprinkler system on the Sub-cellar level 4, 10th & 11th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.