Hereby filing to construct interior partitions, ceilings and doors for for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Sprinkler modifications taking place on the 6th floor (8th floor marketing) as indicated on the drawings.
Installation of temporary p/m hoist complex as per plans in conjunction with general construction work. no change in use, egress or occupancy. hoist complex shall comply with chapter 33 of nyc buildin...
Additional modifications to existing mechanical system and related ductwork for Retail 1 exempt from R421a requirements. Alt 1 121190086.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Construction modifications taking place on the 6th floor (8th floor Marketing) as indicated on the drawings.
Installation of new non-load bearing partition and door. No change in use, egress or occupancy. (Executive Office Security Upgrades).
Filing herewith modification to the existing sprinkler system as per plans filed herewith. No change to use, egress or occupancy.
Filing herewith Mechanical work on the 13th FL. as per plans filed herewith. No change to use, egress or occupancy.
Installation of heavy duty sidewalk shed as per plans. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Hereby filing to install mechanical units with associated ductwork and piping as part of tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Structural modifications as per plans filed herewith new steel beams, new steel dunnage beams as per plans herewith. no change in use, egress, or occupancy.
Modifications to existing sprinkler system and installation of temp loop as indicated on plans. no change in use, egress or occupancy.
Fabrication and installation of 2nd floor fire balcony at front of existing building, to comply with existing second means of egress for the building.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Hereby filing to install mechanical units with associated ductwork and piping as part of tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Temporary platform for a film shoot. Removed at the end of the programing. No changes to existing structures, use or egress.
Temporary structures for The Shed cultural and event programing. Removed at the end of the programing. No changes to existing structures, use or egress