Other Permits in Manhattan, New York
11,231 other permits filed recently
11,231 permits
Mechanical modifications taking place on the 2nd floor as per plans filed herewith. No change in use, egress or occupancy
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
New stair opening at 17th Floor and new convenience stair between 16th & 17th Floors as shown on drawings. No change in use, egress or occupancy.
Minor partition work with general carpentry in apt 7. No change to use , bulk or egress
Application filed for mechanical additions/modifications on the partial 22nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Filing herewith Sprinkler modifications as per plans. Installation of sprinkler heads and associated piping.
provide services related to installation of new underground gas lines between existing building and restorations of supported excavations
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of sidewalk shed in conjunction with M00955498
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Install 1195 lf of supported scaffold at a max height of 70ft around ps 126 school building and in central courtyard area.
Sprinkler work as shown on plans filed herewith.
Propose to perform demo work. No change in use, egress or occupancy.
Limited removal & replacement of existing millwork & lighting, including installation of new security desk and mail package enclosure.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Construction fence filed as per plan provided.
Alt 1 filed to establish public assembly and modify egress for existing eating and drinking establishment at cellar and first floor. No change to bulk or floor area.
Installation of a ventilation system dedicated for FA UPS closet.
Installation of construction fence.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.