Other Permits in Manhattan, New York
11,312 other permits filed recently
11,312 permits
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Tang Temp Egress. Sprinkler work as per plans.
Facade restoration via suspended scaffolds
RETAIL# 2 - Mechanical work for removal and relocating of piping and ducts
Mechanical work from the 3rd to the 5th floor as plans filed herewith. no change in use, egress, or occupancy.
IRA for Gamma sector location inspection
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Sprinkler modifications as per plans filed herewith. No change to use, egress or occupancy.
Suspended Scaffold for Facade Restoration and Inspection as Shown on Plans
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Structural work as shown on plans. No change to use, egress, or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Sprinkler filing in conjunction with ALT 2 filing # M01275925-I1
Place Knuckleboom to deliver materials
New non structural partitions and millwork, flooring, dropped ceilings and finishes. pl work to be filed under subsequent document in conjunction with gc. no change to use occupancy or egress
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
General construction modifications taking place to the tower as per plans filed herein. No change in use, egress nor occupancy
installation of pipe scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Demo of cellar slab & reconstruction of new slab, demo of non-bearing partitions, new stairs to new penthouse addition & partial reconstruction of exist stairs, install new appliances & lighting as pe...