Other Permits in Manhattan, New York
11,314 other permits filed recently
11,314 permits
IRA for Gamma sector location inspection
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Herewith filing to remove and replace chiller in Kind as per the drawings. No change in use, egress or occupancy.
Installation of a heavy duty sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Hereby filing to install mechanical units with associated ductwork and piping as part of tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Application filed accessibility upgrades at entrance ramp on exterior of building along Lexington Avenue
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the nyc building code 2022. no change in use, occupancy, or egress under this application.
Filing DMO means and methods associated with Alt-CO #M01225674-I1. No change to use, egress, or occupancy.
Blank street coffee-- general construction inclusive of partitions modifications for cafe build-out. no change to use, egress, or occupancy.
Herewith filing for the removal of a single Fire Hose Cabinet (FHC) at the 12th Floor (East Wing), as indicated on the submitted plans. No change in use, egress, or occupancy is proposed.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Facade restoration via suspended scaffolds
Mechanical work in 31st floor as per plans. No change to use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Removal of non-structural partitions for an existing mixed-use building. New non-structural partitions and doors will be installed. There will be no change of use, occupancy or egress under this appli...