Other Permits in Manhattan, New York
11,314 other permits filed recently
11,314 permits
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Proposed installation of pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Facade restoration via suspended scaffolds
Hereby filing to install mechanical units with associated ductwork and piping as part of tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Facade restoration as per plans. No changes in egress, use, or occupancy.
Blank street coffee-- general construction inclusive of partitions modifications for cafe build-out. no change to use, egress, or occupancy.
Filing herewith Sprinkler modifications as per plans. Installation of sprinkler heads and associated piping.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Mechanical work as per plans filed.
Sidewalk Shed Installation
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of new sidewalk shed and pipe scaffold with material hoist at 115 east 81st street, manhattan as per plans. there will be no change in the use, egress, or occupancy under this application...
Removal of non-structural partitions for an existing mixed-use building. New non-structural partitions and doors will be installed. There will be no change of use, occupancy or egress under this appli...
Temporary platform to provide access from the street to the sidewalk over the existing sidewalk vault during construction. No change to use, egress, or occupancy.
mechanical work as shown on plans filed herewith. No chance in use, egress or occupancy.
Installation of temporary barrier as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Non-illuminated non-advertising accessory entrance canopy - activate. no change of use, egress or occupancy.
Construction of a 2-hr fire-rated closet for Fire Alarm-dedicated equipment.