Other Permits in Manhattan, New York
11,286 other permits filed recently
11,286 permits
Modifications to the existing sprinkler system on the Cellar, 3rd & 4th floors (Harry Winston - Office Fit Out) as per plans. No change to use, egress or occupancy.
Installation of temporary standpipe system in conjunction with BIS Alt I #121205579 as per plans filed herewith.
Engineered Enclosure System
Installation of temporary suspended scaffold equipment
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary suspended scaffold equipment
Facade restoration as per plans filed herewith. No change in occupancy, use or egress.
Non-illuminated non-advertising accessory storefront awning - apollo bagels. no change of use, egress or occupancy.
Modifications to the existing standpipe system on the 45th Floor, as per plans. No change to use, egress, or occupancy.
Sprinkler/standpipe systems in conjunction with Alt-CO as shown on plans.
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of emergency heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2014 nyc building code
Mechanical modifications as per plans
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Herewith Filing Modification to existing Mechanical System as per plans.
Removal of interior non-load bearing partitions, doors and millwork. No change to use, egress or occupancy
Install of temp custom structure w/netting, no alt to exist structures for Legendary February Triple Threat Contest. A TPA not req. Prod is responsible to monitor site safety & implement HWAP. All pro...