Plumbing Permits in Manhattan, New York
4,193 plumbing permits filed recently
4,193 permits
Install gas and plumbing fixtures on 1st floor, plumbing works as per plan. no change on egress, use, or occupancy.
plumbing work in apt 10A
Plumbing Work Proposed for a Single-Family Home. No Change to Use, Occupancy or Egress.
Plumbing work as shown on plans filed herewith. No Change in use, egress or occupancy.
Plumbing work proposed for an existing apartment. No change of use, occupancy or egress.
Plumbing modifications/additions in conjunction with gc # m01260479-i1.
In unit 17a, new non-loadbearing glass partitions as shown on plans. no proposed plumbingwork. no change to egress, use, or occupancy.
Herewith filing for the associated plumbing application of an interior renovation an apartment at 113 prince street.
Replace condensate lines of existing split units to a funnel drain connection
Renovate existing apartments 5A and 3A. Work to include removing and installing non-bearing partition work and finishes. No change to use, egress or occupancy.
Plumbing work associated with renovation of apt 16a/penthouse, including replacement, relocation, and new installation of toilets, lavs, shower, sink, and washer/dryer, per plans filed herewith. no ch...
Sprinkler work to include furnishing and installing sprinkler main, branch piping and sprinkler heads. Plumbing work to include furnishing and installing new plumbing fixtures and related piping
Installation of (24) sp heads at cellar, (17) on 1st fl, (19) on 2nd fl, (18) on 3rd fl, (19) on 4th fl, (15) on 5th fl, (11) on 6th fl. installation of 56 plumbing fixtures.
Plumbing modifications as shown on plans in conjunction with combination of apartments 5A and 5B on the 5th Floor. Application filed as per TPPN #3/97. General Const. work under Initial Filing DOB NOW...
General plumbing modifcations per plans. no change to occupancy use or egress
Replacement and relocation of fixtures in kitchen. capand remove existing gas line.
Replace Plumbing Fixtures and Gas Stove on Existing Roughing. Cap and remove one (1) gas stove.
Provide all new plumbing work thru-out building for new apartments and infrastructure as indicated.
Plumbing work installation of stacked washer and electric dryer
Modifications to the existing plumbing system on the 29th floor (Sapient Capital) as per plans. No change to use, egress or occupancy