Plumbing Permits in Manhattan, New York
4,193 plumbing permits filed recently
4,193 permits
Gas plumbing modifications taking place on the Cellar & 1st floors as per plans filed herewith. No change in use, egress or occupancy.
Plumbing scope for the general construction job m01216292. bathroom and kitchen fixtures to be replaced. no change in occupancy, use or egress.
Install new gas piping throughout building as per plans. no change in use, occupancy or egress.
Plumbing fixtures filed in conjunction with dob now gc. no change to use, occupancy or egress.
Removal of existing plumbing fixtures and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
Renovate existing apartments 5A and 3A. Work to include removing and installing non-bearing partition work and finishes. No change to use, egress or occupancy.
Replace condensate lines of existing split units to a funnel drain connection
Replace and relocate plumbing fixtures according to drawings. No change to use or egress
Modifications to the existing plumbing system on the 19th floor (Buildout) as per plans. No change to use, egress or occupancy
Plumbing work proposed for an existing apartment. No change of use, occupancy or egress.
Subsequent filing for plumbing work in conjunction with ot job#m01300371-i1. no change in use, egress, or occupancy.
Plumbing modifications as shown on plans in conjunction with combination of apartments 5A and 5B on the 5th Floor. Application filed as per TPPN #3/97. General Const. work under Initial Filing DOB NOW...
General plumbing modifcations per plans. no change to occupancy use or egress
Minor modification to existing plumbing fixtures for apartment renovation.
CHNY Ped ED: Sprinkler and Plumbing modifications to accommodate alterations to the Pediatric Emergency Dept. within the existing hospital building. No change to zoning, use, egress or occupancy.
Plumbing work filed in conjunction with the interior apartment renovation as per plan. No change in use, egress, or occupancy under this application
Plumbing and sprinkler work in conjunction with the renovation of the apartment on plans filed herewith. no change in use, egress or occupancy (5th floor)
Plumbing scope related to amenity renovation at the 8th, No change to use, egress or occupancy.
Plumbing and sprinkler work for the renovation of the existing 68th floor phase 1 of an existing building as per plans filed herewith. no change in use, egress, or occupancy.
Reconnect existing low pressure gas line. no change in means of egress use group or occupancy.