Plumbing Permits in Manhattan, New York
4,177 plumbing permits filed recently
4,177 permits
Replacing of existing floor finishes, plumbing fixtures, appliances, and lighting fixtures. Plumbing shall be filed under a separate application.
Relocate Toilet, Lavatory, Shower, and replace kitchen sink in 2nd FL. Apt, 2R. PL work to be filed in conjunction with GC work M01299522-I1.
Nstall new gas meter & piping. install new indirect water heater.
Propose plumbing work and modification of existing sprinkler system. No change in use, egress or occupancy.
Modify existing plumbing fixtures, add new water/sanitary piping & gas piping with fire suppression shut off valve for new plumbing fixtures, gas-fired HWH and gas cooking equipment for commercial kit...
Plumbing work in conjunction with the interior renovation of apartment 3a on the 003 floor. no change in use, occupancy, or egress.
Proposed plumbing work on cellar, basement, 1st, 2nd and 3rd floor in conjunction with dob alteration job #: m01306053-i1. cap & remove oil tank, and all gas fixtures. no change in use, bulk, egress o...
Plumbing modifications taking place on 37th floor constructon (38th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy.
Modification to plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Subsequence filing for plumbing, replace existing plumbing fixture, gas stove as per plan.
At 1st and 2nd floor tenant space, additions/modifications to plumbing system including new fixturesd and related piping as per plans filed herewith. no change in use, occupancy or means of egress.
Plumbing updates to 2nd floor as per plans filed herewith.
partial interior renovation existing apartment on 9th floor. No change to use, occupancy or egress. Conversion of existing kitchen to wet bar area: relocation of sink, dishwasher, refrigerator. Remova...
Filing herewith drawings indicating modification of the Plumbing on the 35th floor construction (marketed as the 36th floor). No change in use, egress, or occupancy under this application.
Pl work in apt 3b filed in conjunction with dob now pl and mh. no change to use, occupancy or egress.
Plumbing and combination as per TPPN 3/1997 proposed in unit #3F/3G on 3rd fl. Initial general construction, subsequent general/exterior and mechanical application to be filed. All in accordance with...
Plumbing related to interior renovations as shown herewith on drawings. No change to use, egress, or occupancy.
MOdifications to existing plumbing / sprinkler system on 45th floor, various suites.
Installation of new plumbing fixtures in conjunction with gc #m01203973-i1 as per the drawings filed herein.
MOdifications to existing plumbing / sprinkler system on 45th floor, various suites.