Plumbing Permits in Manhattan, New York
4,177 plumbing permits filed recently
4,177 permits
Plumbing work as shown on plans filed herewith.
Application filing remove and replace 1 lav, 1 w/c, 1 dishwasher and two hand sink in connection job# m01313096-i1 at 1st floor bar as per plan. no change of use, eggress and occupancy under this job.
Plumbing and combination as per TPPN 3/1997 proposed in unit #3F/3G on 3rd fl. Initial general construction, subsequent general/exterior and mechanical application to be filed. All in accordance with...
Installation of new plumbing fixtures in conjunction with gc #m01203973-i1 as per the drawings filed herein.
Modifications to the existing plumbing and sprinkler systems on the 4th floor. No change to use, egress, or occupancy.
Plumbing system installation as per plans No Change to Use, Egress or Occupancy.
herewith filing plumbing application subsequent to alt-2 application for cap and removal of existing plumbing fixtures
Job filed for apartment interior renovation with minor layout modifications, plumbing fixture replacements in kind, replace lighting fixture, and finish upgrades. Plumbing work filed in different appl...
Replace all existing sanitary and storm risers at O & P lines. Replace existing kitchen and bathroom fixtures due to fire & water damage at floors 1-8 in the O & P line and unit 1ML first floor only....
New plumbing work apt #807. in conjunction with #m01332767-i1
Filing for new tenant fit-out plan by adding new service counter; wall mounted shelves, carpentry, interior partition wall, new s.s. hood & exhaust duct to the rear of the bldg. All work as per propos...
Plumbing work within apartment. No Change in Use, Egress, or Occupancy
Plumbing and sprinkler modification as shown on the drawings. No change to occupancy, use, or egress.
Plumbing work as per plans filed. filed in conjunction with alt co #m01153658-i1.
Restrooms - Plumbing work on the 7th floor as indicated on drawings.
Additions and modifications to existing plumbing/sprinkler fixtures as per plans filed herewith. No change to use, egress, or occupancy.
Restrooms - Plumbing work on the 8th floor as indicated on drawings.
Application filed for add new plumbing fixtures in a exist. beauty salon on third floor of an existing mix residential and commercial building.
Plumbing scope related to Interior office renovation at the 20th floor, No change to use, egress or occupancy.
Alterations/modifications to existing Plumbing System. No change in use, egress, or occupancy..