Plumbing Permits in Manhattan, New York
4,193 plumbing permits filed recently
4,193 permits
Plumbing related work for the removal and installation of plumbing fixtures and related piping. no change in use, occupancy, or egress
Filing herewith for the interior renovation. partition changes to non-load bearinginterior walls, general construction, and plumbing as per plans. nochange in use, occupancy, or egress. no exterior bu...
Interior renovation as per plans: minor partitions. plumbing filed as subsequent to ot. no change to use, egress or occupancy.
Plumbing work associated with interior renovation of an existing class a apartment including new plumbing fixtures, new sanitary lines, new gas line. no change in use, egress, or occupancy.
Plumbing worktype in conjunction with Alt I application 122193223. NEW GAS / ELECTRIC / INDIRECT WATER HEATER, NEW SANITARY / STORM HOUSE TRAP, NEW PLUMBING INFRASTRUCTURE, NEW RPZ ON WATER SERVICE LI...
Proposed to add (1) sink on each 3rd and 4th floors. No changes to use, occupancy, or use.
Plumbing modifications for 16th floor commercial space
Renovate existing apartment ph12 on the 12th floor. demo and construct non bearing interior partitions, cabinetry and finishes. no change to use, egress or occupancy. mechanical, plumbing & sprinkler...
Plumbing fixtures installation and associated piping as per plans filed herewith. no change to use, egress, or occupancy.
Modification to the existing plumbing system on the 17th floor as per plan. no change to use egress or occupancy
Demolition and installation of core restrooms fixtures, installation of new plumbing fixtures in 19th floor interior fit out. Installation of new sprinkler heads and related piping.
Minor alteration per plans filed within. No change to use, egress, or occupancy.
New plumbing work type filed in conjunction with dob now gc application. new plumbing fixtures at 1st floor to be installed as per plan. no change of use, occupancy or means of egress.
Proposed interior renovation works on 1st floor as shown on plans. the plumbing, mechanical, and structural work type shall be done under separate subsequent applications.
herewith filing application for interior renovation of Apt.2C with work to include Minor Demo and Build-Out of partitions. Plumbing and Mechanical applications to be filed under separate applications.
Plumbing work from the 3rd to the 5th floor as plans filed herewith. no change in use, egress, or occupancy.
Existing dentist office plumbing to be removed. new ADA bathroom and relocation of existing sanitary & storm risers and replace associated in-slab piping per plans. Application filed in conjunction wi...
Modifications to the existing Plumbing and Sprinkler systems on the 4th floor. No change in occupancy, use or egress.
Application filed for plumbing additions/modifications on the 5th & 7th floor as per plans filed herewith. no change in use, egress, or occupancy.
New plumbing work type filed in conjunction with dob now gc application. new plumbing fixtures at 1st floor to be installed as per plan. no change of use, occupancy or means of egress.